Mason-Montgomery Road

Existing Mason-Montgomery Road between Fields-Ertel Road and Socialville-Fosters Road was widened and reconstructed from two lanes to five lanes with horizontal and vertical alignment adjustments made throughout the entire length of the project. Drainage design included the extensions of both 60" culvert and a 4'10" x 13'7" elliptical culvert, as well as the design and installation of three 48" culverts to intercept small streams.

This project was coordinated with the new Proctor and Gamble Research Facility incorporating both their traffic and drainage requirements and landscape requirements along the road frontage.