Towne Boulevard, Middletown, OH

The City of Middletown selected CESO to survey 3,000± linear feet of Towne Boulevard, including cross-sections at fifty (50) foot intervals, 200 feet wide, existing right-of-way determination, and detailed utility locations to be used for road widening design.